First day back in Spain started with a small run followed by setting up the pitch. It normally takes 2/3 days to finish it off and kindly the wind didn’t blow enough to go windsurfing. Jobs completed so far, outside floor down, tent up, plumbing for fresh water and waste, washing machine plumbed in and tested, WiFi set up, TV set up, numerous cups of tea drunk, hidden chocolate digestive found and opened. More of the same tomorrow.